Digitalisation

Increase machine utilization via risk-based planning and scheduling

03 April 2016 by Simio

Risk based planning and scheduling (RPS) is the next generation of advanced planning and scheduling (APS). This paper from Simio describes the advantages of adding simulation to capture possible variations enhancing machine utilization. Which finally means less costs and less energy used per output.

Find out more about Simio solutions in the world’s leading trade fair Hannover Messe 2016. Visit Simio at Digital Factory Hall 6, Booth K0-5.


Related Content   #machine utilization  #simulation  #scheduling