ArticlesProtocol Standard Tertiary 2018 (ENG)
This Protocol is designed for tertiary projects that involve whole building retrofits. It involves multiple measures with limited interactive effects. The Protocol is also designed for secondary buildings that involve multiple measures. This Protocol was developed to allow students to play with their own.
Read Full Business PracticeProtocol Targeted Apartment Block 2018 (ENG)
This Protocol is designed for apartment block projects that involve building retrofits with only one or a limited set of energy conservation measures. It is designed to be used without major interaction between them. The Protocol was developed to help block projects build retrofits without major.
Read Full Business PracticeDigital Transformation of Energy Utilities – Shifting Gears?
Since 2014, utilities have been increasing their investment in digital infrastructure. This is the key finding of the IEA report energy and digitalization. The report provides a detailed overview on how digitalization changes energy consumption in transportation, the industry and the residential sector.
Read Full articleProtocol Large Tertiary 2018 (ENG)
This Protocol is designed for large scale tertiary projects that involve whole building retrofits. It involves multiple measures with significant interactive effects. The Protocol was developed for large-scale tertiaryProjects. This Protocol was designed for small and medium-scale.
Read Full Business PracticeProtocol Large Apartment Block 2018 (ENG)
This Protocol is designed for large apartment block projects that involve whole building retrofits. It involves multiple measures with significant interactive effects. The Protocol was developed for large buildings with multiple measures and interactive effects. It is designed to be used for complex building retro.
Read Full Business PracticeProtocol Targeted Tertiary 2018 (ENG)
This Protocol is designed for tertiary projects that involve building retrofits with only one or a limited set of energy conservation measures. It is not intended to be used as a tool for secondary projects that use only one energy conservation measure, without interaction between them.
Read Full Business PracticeFarewell to Traditional Compressor-Based Refrigeration?
ULT freezers with a compressor-based cascade refrigeration system can use as much energy as a typical U.S. household annually. C Cascade systems use synthetic refrigerants which cause ozone depletion. A Stirling cooling system uses 60% less energy.
Read Full articleIncreasing the flow of investment into energy efficiency in industry
EEVS survey in the UK shows that over 5 years only 5% of projects were financed by third party finance. Most of the time the investor is the CFO, in fact even if projects are externally financed. In any organisation things that are.
Read Full articleUPDATE - ICP: Top 2 benefits for energy efficiency project developers
ICP (Investor Confidence Project Europe) delivers a standardised framework for developing energy efficiency projects. Frameworks already exists for buildings and are now being developed for projects in industry, district energy and street lighting. ICP is looking for project developers.
Read Full articleThe benefit of compressed air systems becoming smart - a Boge example
The BOGE continuous improvement programme (CIP) is already a reality today. It reduces the loss of efficiency in a compressor due to wear and tear in operation. This can only be achieved through regular maintenance carried out by specialists. The.
Read Full article



